Link measurements & points
In some cases, the original survey has to be adjusted. When points are adapted, the measurements do not reflect the changes.
Using the command Link meas. & points, measurements are recalculated based on the adapted points.
Click Survey.
Click Link meas. & points to enable the option.
If option is enabled, it keeps the connection between points and measurements. If points are moved the measurements are automatically updated with new values.
If points are removed the status of the corresponding measure becomes “not used”.