-
It is possible to transfer reference points from the Reference points list to the Points list.
-
Open the Job tab.
-
Select Points/Measurements/Codes.
-
Open the Reference points tab.
-
Select Tools to open the list of available tools.
-
Select Save/Load and Transfer reference points to points.
-
Check the points from the list, or tap on Tools to use Selection rules or select/deselect all the points.
-
Select Edit.
-
Select how to transfer the points from the Reference points list to the Points list.
-
Copy selected points: the selected points are copied to the Points list.
-
Move selected points: the selected points are moved to the Points list. The selected points in the Reference points table are removed.
-