-
It is possible to transfer topographic points from the Points list to the Reference points list.
-
Click Job.
-
Click Points/Measurements/Codes.
-
Open the Points tab.
-
Click Tools to open the list of available tools.
-
Click Save/Load.
-
Select Transfer points to reference points.
-
Check the points from the list, or click Tools to use Selection rules or select/deselect all the points.
-
Click Edit.
-
Select how to transfer the points from the Points list to the Reference points list.
-
Copy selected points: the selected points are copied to the Reference points list.
-
Move selected points: the selected points are moved to the Reference points list. The selected points in the Points table are removed.
-
-
The points are now available in the Reference Points table.